Saray Hydroelectric Power Plant

The brief summary of the project:

INCIRLI Regulator and HEP Generation Facility in Rize province Kalkandere district was commissioned on 26 May 2011.

Project Details

Project Type Design – Build – Operate
Project Location Rize, TURKEY
Owner Laskar Enerji Üretim Pazarlama A.Ş.
Project Start 1 March 2008
Project End 1 May 2011

Key Project Quantities:

  • Water Transmission Line (L=223 m, D=5.50 m)
  • Water Intakes And Settling Basin (3 Nos 6.00×3.50 M Vertical Inlet Gate)
  • Drill and Blast Water Tunnel (L=6570 m, D=4.50 m horse-shoe lined tunnel)
  • Surge Tank (D=18 m, H=64 m circular section, steel lined reinforced concrete)
  • Penstock (L=84 m, D= 3×1.50 m circular section, embedded in reinforced concrete underground)
  • Power Plant (3 units, each 8.40 MW, total installed capacity is 25.20 MW, 126,000,000 KWh/year energy production)
  • 500,000 m3 earthworks